Depending on several circumstances both might be advisable.However, for a well insulated building you need to insulate the slab as well. Here we show how a concrete slab is done in one go in Germany.
For best recommendation for your project, please contact us
|
Fill up the site completely with sand inside the whole perimeter |
|
Compact it very well |
|
Do not forget the trenches for your ducting and piping |
|
Start laying out the shuttering boards along the perimeter |
|
Best to use high density Insulation boards, the perimeter is now laid out clearly |
|
Cover the remaining surface with plain boards |
|
Fixig pipes for floor heating/cooling is easily made with brackets stuck into the boards |
|
Do not forget to put the dashboard onto the right place |
|
The concrete-mixer with an extension can easily cover the whole ground, so a pump is not needed. |
|
If you use steel fibre concrete, a steel mesh is not needed |
|
Make it plain and very smooth |
|
The more even the surface is, the faster the Styro Stone walls are set afterwards |